110 meter shaft sewage removal

London’s largest shaft required a powerful machine which could tackle the task of removing vast amounts of sewage waste.

In one of Terminators most accomplished projects, it was judgement day for this particular sewage waste project. Removing sewage waste on an industrial scale from over 100m vertical climb was thought to be one of the industry’s biggest challenges, with many failing to construct a strong enough plan to execute such a technical job and have the equipment and tankers that could manage such a job.

Terminator makes use of its bespoke technical abilities, removing waste from challenging locations. Terminator was commissioned to carry out tasks that are thought impossible, and make them possible, and this is certainly a tanker that has succeeded in doing so.

Terminator makes use of its bespoke technical abilities, removing waste from challenging locations. Terminator was commissioned to carry out what was once thought impossible, possible and this is certainly a tanker that has succeeded in doing so.

Job Done!

  • 110 meter shaft
  • Terminator
  • Waste
  • Sewage
  • Vacuum Tanker

Fun facts about this project

100
Meter of hose used
10
Tonnes of waste removed in 2 hours
110
Meter shaft
140
Meter below ground